Sunday, August 28, 2011

You are not gonna believe this…

Hello again, intrepid followers!  We send positive waves of energy to all our readers on the East Coast that this nasty storm doesn’t turn out as bad as it looks.  As you all hunker down to ride it out, we thought you might appreciate a diversionary tale of more light-hearted woes from the annals of the renovation.

I know you’re not going to believe it, but a week ago as Irene was gathering strength, she looked to be taking aim at our little island before she got a hankering for a big island called New York.  Of course, I went into preparation overdrive and abandoned the projects we had already begun (more on those later) in order to get ready for at least a big storm.  There were two large trees very close to the side of our house, one of them being a 30’ ficus tree, whose limb was actually leaning into the edge of the roof.  It had been annoying me since we got here, but with the impending storm it was time for it to go (I continue to hope the Gay Authority doesn’t revoke my card for being possibly the only gay man in Creation who doesn’t see the merits of a ficus as accent foliage…)



In any case, little Jack took on the erstwhile beanstalk with his trusty handsaw (Kevin, wisely I’m sure, doesn’t trust his accident-prone partner with a chain saw).  Of course, the evil giant who lives next door (no kidding – a large Russian woman with enormous and frightening boobs) poked her head out her bedroom window while I was perched precariously on the precipice of the roof, and lamented how all the shade the poor tree had offered was now going to be lost.  I countered that if the tree hadn’t tried to replace the shade my roof offered with its own, I might have spared it.  Ultimately, she realized she had no standing since the tree was actually in my yard.  However, I don’t think the story ends quite there.  You see, as seems to be the case with many evil giants, she has a sidekick – a yappy little dog that would be more suited to life at the end of a mop handle than a leash.  I believe the giant continues to visit her displeasure upon us through the proxy of her sidekick; I have begun noticing a regular deposit of little doggy poops in our front yard.  The tree may have annoyed me, but poop and Kevin?  Hoo-boy, watch out giant!  More to come, I’m sure…

It’s Better to Beg Forgiveness Than to Continue Asking Permission

With both trees out of the way, Irene shrugged and decided to take her path of destruction northward.  Thus with no trees and no storm to contend with, we were able to resume work.  At the end of our last adventure, you may remember the desperate duo was trying to push things along through the city bureaucracies.  As you may also remember from previous episodes, a big priority for us is getting the perimeter sills of the house replaced; figuratively and literally it is imperative to have a solid foundation on which to build.  We were put in touch with a local engineer who will have to sign off on this work before the city will grant us a permit.  We were further instructed that we’d need to expose the sills in order for the engineer to get a proper sense of the extent of the job.  That, of course would require removing a bunch of siding – an event for which we are still awaiting the permit.  Breathe deeply; trust me, it helps.

Anyway, as hard as it is to believe, since all of our efforts with the city have thus far yielded one – yes, that’s correct, one – permit (and that one is to paint the roof, whoop-dee-do), we began forging ahead without the siding permit.  As I started pulling the siding down, I actually began to understand HARC’s concern with removing too much of it.  There is a subtle difference between the old Dade County Pine siding and the new stuff.  The DCP has a richer, deeper grain than modern pressure-treated lumber.  Kevin was HORRIFIED when I started trying to explain this to him.  He exclaimed, “Wood is wood!  You paint it and it all looks the same!!  Quit drinking the Kool-aid and take it down!”  Bless his heart – hard to believe we celebrated 15 years together this week…  Despite his contention, I have still tried to preserve as much of the siding as possible as I’ve taken it down.  Some of it is indeed too far rotted to save, but much of it has enough good wood that I can probably cut it into lengths I can use to fill in.  And don’t tell him this, but I intend to use and move as much as possible to the front of the house (where it’s visible from the street).  It’ll just look so much more authentic.  Please keep that between us, co-conspirator!


Any Day That Begins With Cheese Curds Instead of Milk on Your Cereal Cannot Bode Well

Pulling the siding down in a preserving manner was a time-consuming and challenging endeavor.  While the 100-year-old nails in many of the planks had disintegrated to dust, there were plenty I had to use a sawz-all to cut out (mostly in the newer replacement sections).  You have to slide the blade up between the lapped siding to get to the nails that are concealed behind the board above.  It’s a lousy job.  It got especially difficult in places where there was plumbing.  It’s one of those short-cuts that drives me crazy about Key West.  As attentive as the preservationists are to detail, they don’t seem to have any problem with people running the plumbing on the exterior of the house!  It looks awful, and it becomes nearly impossible to maintain the siding without doing some kind of damage (I presume that by now, dear heart, you see where this is going…) 





I had gotten 3 courses of siding off  ¾ of the house, and it was time to remove the last ¼.  Unfortunately, this last quadrant was behind the water heater and a bunch of PVC piping (yes, the water heaters in Key West often live outdoors to conserve interior space).  The last piece of siding was a 16-footer.  I supported it, cut all the nails I could find, removed the supports, and then tried to take it down.  It behaved like a seesaw, like there was still a nail in the middle somewhere.  I prodded, poked, and pried, but I couldn’t figure out what was holding it.  Then I discovered one tiny little finishing nail peeking out.  Aha!  I yanked it out without a second thought, and the 16-foot piece of siding dropped like an anvil – right onto all the PVC piping, which immediately shattered in about 4 places.  It looked like we had drilled a well.  Water was spraying out from under the house, out of the top of the water heater, out of the supply line to the washer (also outside), everywhere.  Fortunately, when one lives in a zone where the weather could one day move one’s house off its foundations, one knows where and how to kill the water at the street!  Having thus staunched the flooding, I hiked down my shorts to expose the proper amount of butt crack, and proceeded to spend the rest of the afternoon putting the plumbing back together.

Wow, Look at That

With the siding finally all removed, we made some interesting discoveries.  (Andy E. and Patty-O, be patient – there is some cool stuff coming for you guys!)  The first and most dramatic discovery was the extent to which the sills were rotted.  It is almost impossible to believe the house hasn’t collapsed onto the ground.  Even the engineer was shocked – he was moved to remark that he couldn’t even imagine how many other old houses on the island are in danger of falling down because most people wouldn’t be getting in to the kind of renovation work that we are.  Lucky us.



This is the front corner of the house.  The concrete on the right is the porch.  The horizontal beam on the left is the sill beam and the vertical beam is the front wall of the house.  See the hole to the right of the sill and below the vertical?  There should be something filling it!


We are probably going to have to replace the existing 4 x 6 sills with double or triple 2 x 10’s.  It’s quite a testament to the strength of the old DCP lumber that we have to increase the sizing so much for new lumber to do the same work.  Of course, because HARC won’t allow the height of the house to change for this sill work, we are probably going to also have to replace the piers on which the sills sit (at least that’s what the engineer wants us to do).  Oh goody – all my worst nightmares come to pass.  Kevin thinks I am completely insane to want to try this work ourselves, but we’ve been told that someone else in town had a very similar job done (jacking up the house, digging down to the cap rock, pouring new concrete piers, replacing the sill beams, and lowering the house back down).  It cost them about $17000.  There goes the pool…  We’re awaiting the engineering now to see what he recommends, but I really want to try this ourselves – for the adventure of it, and to try and save a load of money.  Wish us luck!

Interesting discovery number 2 had to do with my old nemesis, the plumbing.  After we had exposed the lower perimeter of the house by removing the siding, we were able to see better under the house.  I happened to glance at where most of the drains come together before tying in to the main sewer line, and I noticed that the drain coming from the kitchen had an odd offset to it.  As I looked closer, I realized that it had an odd offset because it wasn’t actually tied into the main sewer lateral!  It’s easy to see where they had prepped the pipe with PVC primer to make the connection, but it must have been lunchtime, and they never finished it.  We’ve had the house for over 10 years, and we haven’t had any drain work done since we’ve owned it, so one can only assume the kitchen sink has been draining onto the ground under the house for at least that long!  And to make it even more exciting, the washing machine also drains through that branch line.  How it is that we’re not overrun with mosquitoes from that swamp is mind-boggling.

Interesting discovery the 3rd is in the basic construction of the house (okay, Andy and Pat – here is your reward for reading this far).  Many of the connections between the wood framing members were done without any hardware.  The house is 55’ long, so of course the original 4 x 6 timbers didn’t come that long.  They joined the timbers using some very cool looking scarf joints.  The timbers were cut with mirror-image interlocking sections that were forced together with wooden wedges. 

A little how-to diagram of the scarf joints found in our old sill beams.


Equally cool was the way they tied the wall studs to the perimeter sills; they used mortise and tenon joints with wooden pegs.  For the technically declined, that means that they carved slots into the sill beams, and carved “tongues” onto the ends of the wall studs.  They then slipped the stud tongue into the sill groove, and anchored the connection by drilling through both framing members and inserting a wooden peg in the hole to tie it all together. 


 The wood "pin" sticking out of the rotted horizontal beam is from the original 1908 mortise and tenon joint used to secure the vertical wall beam to the sill beam.  The original framework of the house used no nails or screws.


The connections are strong, yet allow the building to be flexible for such occasions as when Irene or any of her distant relatives might have come a-calling.  You may also remember that we observed many of the hundred-year-old siding nails had deteriorated to iron dust (humorous aside:  as we continue to wait for the permit to physically remove siding where necessary, it has begun FALLING off in places where the nails have rusted away.  I am starting a separate collection of those pieces in the house).  One can only imagine what would have been happening to the house if they had used nails to put all these joints together, and the nails rusted away!  The assumption is that this type of construction was inspired by the lessons of shipbuilding, where the vessel had to be resistant to the ravages of salty air, as well as being rugged enough to withstand the stresses of a changing environment.

Uh oh – it seems as though we are veering perilously close to another history lesson, and rather than subject your patience to another of those, dear reader,  it’s time to sign off…  Until next time, keep dry, keep safe, and keep the faith!


Friday, August 19, 2011

Patience Comes to An End

Welcome back, friends!  In our last episode, the tentative twosome was attempting to negotiate their way through the treacherous currents of the city bureaucracies.  Guess what!  As with any good soap opera, the fact that you haven’t heard from us in while doesn’t mean you’ve missed anything – we’re still floundering right where you left us…

Last week began with a follow-up call to our new friend at HARC to see where we were with approvals.  We got sign-offs on a couple small things (painting the roof of the main house, and some exterior work to the little guest house).  However, there were issues with some other projects (what a surprise).  We had applied to remove some rotted exterior siding and to replace rotted sill beams on the main house.

Typical example of rotted siding (and bad plumbing).

Unfortunately, we didn’t specify HOW MUCH siding needed to be replaced – less than 15% of the total could get staff approval, but more than that would require an audience with the full HARC commission.  That was dopey enough, but the real kicker had to do with the sill beams.

In previous posts, we explained how everything had to be approved by HARC before going to the building department for permitting.  As ridiculous as it sounded to have to apply to replace something that is not visible from the street, we were told we had to get approval on the sills anyway to make sure we weren’t changing the height of the house.  After submitting the application, however, we were told it wasn’t acceptable because it hadn’t been approved by the building department.  Huh?  In a true dose of circular logic, we were being told that we couldn’t get a permit from the building department without HARC approval, which we couldn’t get without a permit from the building department!!

After Kevin cleared the phone of the bits of brain that had exploded out of my head during the conversation with HARC, I called the building department.  They said they could sign off on replacing small sections of sill, but if it was more than 4-6’, they’d need stamped engineering drawings.  Having thus decided to swallow that bitter pill, my next phone call was to our local consultant (a friend of Kevin’s folks).  He said his engineer would probably want to survey the existing sills first, so he recommended removing enough siding to expose the sill beams (probably 2 or 3 courses).  That’s right, clever reader – we have come full circle back to our original HARC problem of how much siding gets removed.

I did a rough sketch of where the siding was actually rotten, calculated what percentage of the total square footage of siding that was, tripled it (in case I found more), and came up with about 13%. I then decided (foolishly, it would turn out) to be as honest with HARC as possible.  We submitted a revised application explaining that we might need to REPLACE as much as 13% of the siding, but might need to REMOVE as much as 50% to do all the maintenance work required.  I was very clear that we would not be replacing 50% of the old siding, just removing it and putting it back.  This new application was met with a dour look, a shake of the head, and a “we’ll need to consider this” comment.  Disappointed by the lack of enthusiasm, but undaunted, I thought we were at least on the right track – this new application had been submitted early enough that it could make it to the next HARC commission meeting if necessary (we knew we couldn’t get it into the meeting last week, but at least it was in the pipeline for the next one).  In the meantime, we still had plenty of “surreptitious” work to do to the back cottage to keep us busy.  And the roof painting project had found its way to the next level with the building department (applying for the actual permit), so life was good.

Welcome to Kangaroo Court

Because we thought it might be possible we’d be summoned before the majesty of the full HARC commission at some point, we decided to observe a public session and see how it all works.  It doesn’t.  Of 14 items on the agenda, 9 were postponed until the next bi-weekly meeting, and one was flatly rejected.  One postponement was required because the triumvirate (there should have been 5, but 2 of the lords had been excused) needed more “documentation” as to why some rotten porch columns needed to be replaced.  The poor guy had already been banished once before (2 weeks prior) to investigate the possibility of salvaging the exteriors of the columns, replacing the interiors with steel, and re-wrapping the salvage over the steel.  He had discovered that they were too far gone, and came back with a comparable plan (with manufacturer’s drawings) to use steel columns, and then cover them with new wood (not fiberglas, plastic, or vinyl) that had been turned to exactly match the old columns.  The three monkeys, however, did not feel there was sufficient evidence that he couldn’t salvage the existing columns, so they sent him away to bring more proof.  I can only hope that next time he arrives with a wheelbarrow full of wood pulp and dumps it at their feet…  Another postponement was necessitated because one commissioner decided he had a conflict of interest, and recused himself on the spot.  The other two decided they did not alone constitute a quorum, so the applicant’s business was postponed for another two weeks!  They are sticklers for procedure, including an insistence that all business coming before them be presented two Fridays before the meeting.  They therefore should have known about the conflict well in advance, and they shouldn’t have “excused” anyone if it meant being unable to conduct the people’s business!!  Despite the foregoing, the most heinous of  their acts that day was in the rejection of an application.  For a change I won’t elaborate on the details (the evidence and testimony were very involved), but the gist is that they simply lied in the face of the facts.  As best we could surmise, there was a political component to this one application (a city commissioner even spoke about it), so the goon squad fabricated a reason to reject it.  It was absolutely astonishing to witness.  But at least we got a taste of how the system operates, and hopefully picked up a few tips on how to dazzle these buffoons with enough pomp and circumstance if our time comes.

The Work Continues

The floor tile arrived for the back cottage, so we continued prepping to lay tile while waiting for word on our other permits.  We also started re-routing plumbing to get the toilet and sinks where we want those drains before laying the floor. 

Cottage Bathroom plumbing ready.  Next steps are to close up walls and install the pocket door in the foreground.

It’s all necessary work, but I was getting antsy to deal with the real meat of this project – replacing the sills.  I called HARC early on Friday of last week (the deadline day to get applications submitted to get to the next commission meeting) to see if I could come to the office to talk through my siding application.

(Remember the circular logic: I need HARC to approve my application to get a permit from the building department to pull the siding to be able to have the engineer START the process of going to the building department to sign off on a plan to replace the sills that HARC can approve to get the building department to give me a permit to do the work.  If you need a drink, please get one now)

Anyway, the poor, overwhelmed darling started waving the red cape at me by saying she wasn’t taking any walk-ins that day and she hadn’t had a chance to review the application.  I charged.  I told her we weren’t delaying any longer.  I told her we needed to start, and I was already on my way over to take back the application, and re-submit it to take down less than 15% of the siding.  I told her that I had seen how the commission worked, and I was not waiting another 2 weeks to start.  She reluctantly caved (I think mostly to keep a raving lunatic out of her office), agreed to strike the 50% line, and signed off while I was on the phone.  Finally, our little application was moving to the building department…  Next stop, demolition!

That’s about all the energy I have to write for this episode, dear reader, and I suspect it’s about all the energy you can muster to have read it!  Join us again for future adventures, and remember how once upon a time you all thought we were going to be living the dream…

Sunday, August 14, 2011

Photos of Construction

Where better to start than in the bathroom!  We are focusing on the rear cottage right now because this is where we will live while the main house is under construction.

 Last week - demolition of the old bathroom


Several days later - more demo, including floor repair



Past several days - Demo work complete, now the cement board is being laid for the new tile floor



Saturday, August 13, 2011

Full Moon over Key West

August 12, 2011
(who knew my little Canon could take such a nice photo!)


Saturday, August 6, 2011

Fish On!

During our first two days in Key West - before we quickly turned around and went back to NY, we took a few minutes to do some shopping for important, necessary items.  You know, things like milk, laundry detergent, toilet paper...and a grill.  Its not as capricious as it sounds.  Fairly soon as the renovation moves along we won't have a fully operable kitchen.  Yes, we both enjoying grilling, but we actually will need it and use it quite a bit in the coming months.  Big thanks go to Jack's brother Jim and his other brother Jeff and family who made the purchase possible through some of the best presents ever - Home Depot gift cards!

As soon as we got back to Key West, one of the first jobs was to assemble said grill and give it a trial run.  Thankfully, we had a hungry group ready to test it out.  Jack christened it with some fresh, delicious Mahi-Mahi.  And as you can see below, the taste testers were not disappointed!

ooooo!  shiny!

Kevin's parents spent a few days in Key West helping us get set up and organized.  Here we are sitting down for our first meal in the house at our makeshift dining table.

 Gina, don't look at this photo.  Your son is at the dinner table with no shirt on!


Tuesday, August 2, 2011

Arborist in training


Jack practicing his skills at tree work.  Don't worry, its not some ancient hardwood.  Its just an overgrown Ficus tree growing too close to the house.  It took all my power to stop Jack from buying a chain saw.


Monday, August 1, 2011

Week in Review


Hello again, faithful followers!  Sorry for the long delay between posts, but it has been an unfortunately uneventful week.  We’ve been doing little more than yard work and window-shopping (figuratively and literally) as we wait for the wheels of the local government agencies to turn out the paperwork we need to get moving.

As you may remember from previous episodes of our saga, approvals are required from one government agency (HARC) before we can get permits from another government agency (the local building department) at which time we can actually order the materials approved by yet another government agency (the state building department) before we can begin our renovations.   It’s cumbersome, and it’s time consuming, but at least the system has the benefit of also being completely illogical.  Allow me to explain:

Because we live in the Historic District (the emphasis being on strict), we must unswervingly adhere to the standards set forth by HARC regarding building materials. To their credit, HARC works very hard to maintain the historic nature of the homes.  They therefore insist on the use of wood, rather than vinyl or aluminum products.  Unfortunately, while it all looks beautifully authentic to the period the homes were built, wood siding is susceptible to termite damage and rot (chronic problems in the tropics), and wood windows are not impact-resistant (another challenge in an area subject to high-wind weather conditions, more commonly known as hurricanes).  It is, in fact, a violation of the state building code when replacing exterior windows and doors not to use Miami-Dade impact-rated materials… everywhere except Old Town Key West.  This anomaly was cheerfully explained to us by a salesman whose wooden windows cost roughly double what comparable vinyl-sash windows cost. 

We’re From The Government, And We’re Here To Help You

(Here comes another history lesson, so get ready to jump ahead if this is not your cup of tea)

Back in the 60’s, some well-intentioned preservationists petitioned the state legislature to provide for a vehicle to protect the historic structures of Key West.  The pre-cursor to HARC was thus born.  But as with many well-intentioned beginnings, there were unintended consequences… Through the 70’s this body gained clout and strength within the state of Florida until 1983, at which time they approached the National Park Service and got all of Old Town listed on the National Registry of Historic Sites.  They then accepted federal grant money to help codify and strengthen their regulations, and the old preservation society became the Historic Architectural Review Commission – a new entity now under the auspices of the U.S. Department of the Interior.  Voila - in one political masterstroke, HARC became a federal agency, which is why they now have the power to override state building codes.

(Non history-buffs please feel free to re-join the conversation)

The cheerful window salesman explained that since no right-minded person would ever use wooden windows any more in the age of polymers and composites, there are very few companies that still make wooden windows.  Thus, if we need wood, we are beholden to Daryl and his other brother Daryl in the foothills of northern Maine for some old-school craftsmanship.  Such things do not come cheap.  Additionally, since these windows have the added benefit of not only being expensive, but also being ineffective in a windstorm, we will be required by the building department to install separate hurricane shutters.  Oh goodie. However, he thought it might be possible for HARC to allow the better, cheaper, impact-rated windows in areas of the house that are not visible from the street.  That, however, would be entirely up to them.  Our pool is beginning to look like a distant fantasy…

We’re From The Government, And We’re Here To Help You (round 2)

On Wednesday we did finally get to sit down with the woman in charge of HARC.  She was very pleasant and very supportive of our planned renovations; they do so love to see the old buildings getting restored.  Some of our projects will be able to proceed with simple staff approvals, but some are destined to go before the entire commission – even though the commission will in fact endorse and approve those projects, they still need to hold hearings.  Oh, and by the way, they only hold those hearings every two weeks.  Oh, and your business will need to be heard at not one, but two successive bi-weekly hearings.  Oh, and you need to have all your submittals for the first hearing in by the Friday of the week prior to the week prior to the week of the hearing (no, the foregoing was not a typo).  Yes, gentle reader, it will take almost a month and a half to get our plans through HARC – and THEN we get to try and get building permits.  Oh, and did I happen to mention we have to physically be in attendance at these hearings?  Otherwise, our business will get tabled until the next one.

Our heads were swimming (more like drowning) with all this happy news, so we took our permit request forms (just HARC’s – none yet for the building department), and started trying to process this mess.  As I observed earlier, beyond being time consuming and cumbersome we also discovered how illogical the application process is.  One of the required submittals is an illustration of the products to be used in construction. (of course, applications cannot and will not be reviewed without all necessary submittals attached).  However, in a classic example of circular logic, you don’t know what products you’re going to be allowed to use without HARC’s having approved them first!  Undaunted, we have nevertheless submitted our preliminary applications and attempt to soldier on.


We are thus in a holding pattern with our big projects as we await the beneficence of the local bureaucracies.  We contented ourselves in the meantime with some quiet demolition (shhh!), and a lot of yard work.  I have had no voice for the last week (not just with the bureaucracies, either; I literally have lost my voice!) because I think I have been kicking up all sorts of mold and other tropical bacteria while mucking out years of leaves.  We have also been quietly doing a lot of tree “pruning”, which we have to keep under the radar.  There is apparently a tree czar in this town, through whom all tree work needs to be approved (no kidding – there is actually a spot on the HARC application for submittals of tree removal permits).  And before we get into round 3 of  “We’re Here From The Government…”, it’s time to sign off.

However, so as not to leave you, dear reader, with the unfortunate impression that all is doom and gloom here in Paradise, we did go for afternoon cocktails at our favorite watering hole yesterday.  As we were sitting by the pool, we noticed a bumper crop of fruit in the enormous tree next to the garden bar.  We were told by the owner that it’s a 150 year old avocado tree.  While we were talking to him, one of the avocados jumped right out of the tree in front of Kevin!  The owner told us to take it – they fall all the time, and he’s just happy when they don’t hit the customers!  Now I ask you: where else can you be minding your business, and have unprocessed guacamole drop contentedly at your feet?  Gotta love this island – quirks and all…  Thanks again for reading.

We discovered a medium-duty extension cord hot wired into the electrical box.


 And then it ran through a tree and ended up buried in a pile of dead leaves.  Quality craftsmanship!