Preparations are under way for demolition of the existing concrete front porch.  Yesterday we removed the old landscaping.  Don't worry, no plants were harmed in the process.  We are working diligently to find new homes for them.



Thursday, November 24, 2011

Happy Thanksgiving!


Welcome back, voracious followers!  I hope your appetite for reading is matched only by your appetite for turkey on this Thanksgiving Day, because a narrative feast of epic proportions is about to be laid before you.  Finish your dinner, enjoy your football games, then settle in to indulge your taste for whimsy and woe, because this is gonna take a while!

First, An Apology From the Editorial Department

The perspicacious among you will have noticed that our past post about the water heater seemed to end rather abruptly.  I was informed about this stylistic peccadillo, but dismissed it as a simple desire for the longer episodes of the sort to which you’ve become accustomed.  Then I read the post myself, and discovered half the story didn’t get online!  As it turns out, the blog curator (I am personally not allowed to upload anything I write myself without Kevin having approved the formatting) unintentionally expurgated half the post because it was below the page break on his computer…  Fear not, however; I do believe that the curator was sufficiently chagrined so as not to allow such an egregious assault on the narrative again.  With that bit of unpleasantness behind, let us now begin our tale.

Miracle on Varela Street


Feast your eyes upon this – the holy grail of our building permits; we finally got the permit to repair the rotted sill beams!!  Our entire renovation project has been effectively bottled up while we chiseled out this stupid piece of paper.  Of course, we did work on other projects as we tried to coerce, coax, and cajole this one to actualization, but the real meat of the renovations cannot begin until we fix the foundation.  It has been a long time coming, so let us briefly review the epic saga that led to this glorious moment.

As I’m sure you remember from the unfortunate photos in earlier posts, the 103-year-old sill beams on which the house rests are rotted beyond repair; in some places, the floors are actually dipping below the walls.  Our first attempt to get a building permit to replace them as “owner contractors” was rebuffed because the scope of the job was large enough that the city required stamped drawings from an engineer or architect before they would issue the permit.  Welcome to unbudgeted item number one…

We contacted an engineer back in August, did all the prep work he asked (remember the Deepwater Horizon situation with the plumbing as I tried to remove the siding?), and tried for more than six weeks to get the stamped drawings of the new foundation work.  At least one of those weeks was consumed by the engineer’s going duck hunting, and we were at odds for the last three of those six weeks because he wanted us to create footings under the house, which I resisted.  For the truly technically uninterested, this might be a good time to skip ahead; for both of the rest of you, I shall attempt to be concise about the problem:

The rotted sill beams sit atop concrete piers in the soil beneath.  We MUST repair the beams.  As far as I’m concerned (and it is my house, after all), everything else is negotiable.  The engineer came up with a plan wherein we would dig up the soil, and jackhammer 3’ x 3’ x 10” deep holes into the rock below (at 20 locations).  Then we drill further into the cap rock and epoxy rebars vertically into it at each location (rebar = metal rods, for the technically declined of you who were brave enough to follow along despite my warnings).  After installing the rebars, we refill those holes with concrete around them, creating footings.  Once the footings cure, we build forms on top of them (around the vertical rebars), and pour new concrete piers.  After the piers are set, we attack the task of installing new wooden beams on top of them to support the house.  (Oh, and by the way – we have to jack up the house off its existing, crumbling foundation and temporarily support it while we do all the foregoing).  So much for being concise – Sorry!

This detail was a “work in progress;” the actual footing was supposed to be set in the rock, not on top as it’s shown here

Technically Uninterested, please rejoin the conversation here:

Anyway, while I had allowed myself to get bamboozled into accepting the need for replacing the piers in addition to the wooden sills (the Kool-aid is indeed strong down here), I could not stomach the footings as well; in no logical universe did it make sense to me to open 20 craters in the rock that we would then fill with new rock (in the form of concrete).  Besides, I had begun to recognize that the expanding scope of work was rapidly beginning to strain the limits of my capabilities, so we started talking to local contractors about assisting.  They were fairly consistent in estimating that each pier alone would cost about $1000, which didn’t include the “oh-by-the-ways” they were certain to encounter along the way.  Yikes - the pool was starting to look like a birdbath… However, they did each reinforce my contention that the footings were arbitrary, as they had certainly done this work elsewhere without digging additional footings. Thus, I continued to press the engineer that I did not want to spend the time, energy, or money to do so much extra work.  Incredibly, for more than three weeks this continued, until I finally couldn’t take any more and said I would need another opinion before I could consider moving ahead.  In the spirit of true brinksmanship, he let me know that he’d be perfectly happy for me to get one.  So I did.

We called a local architect. This guy was the city’s architect back in the 1970’s before breaking out on his own, so it seemed as though he’d be particularly qualified to assess these old structures.  His drawings are acceptable to the building department – I checked him out before veering down yet another rocky road – and I suspected an architect would be a lot less conservative than an engineer.  He was.   It was obvious to him that the sills needed replacing, but he thought the piers were in fine shape, and had probably done all the settling they were going to after 100 years (might I once again be hearing the babbling sounds coming from the water feature of our new pool?)  He told us that if we chose to hire him, he could get us stamped drawings for the building department within a week or so.  Of course, no sooner did we enlist the architect’s opinion than the engineer acquiesced on the footings.  After WEEKS of my cajoling, exhorting, and rationalizing, the engineer presented what I had been asking as if he’d just thought of it for the first time!  It was as though he hadn’t heard a single thing I had been saying up to that point.  I therefore thanked him for his time, signed up the architect, and headed towards “happily ever after.”  Well, almost…

The architect did absolutely everything he promised, and had drawings to present to us in just over a week.  Prior to handing them off, however, he did run his plans past the chief building inspector as a work in progress to be certain we wouldn’t have any problems.  We did.  The inspector told him we had to replace the piers, because he didn’t see how to attach the new sill beams to the old piers and bring it all up to existing code.  Oh no, thought I – we are NOT getting out of the pool again just to bring one aspect of this project up to an existing code when we are REQUIRED by the city to violate others (remember dear old HARC and their prohibition against hurricane-rated windows in the historic district?)  Anyway, the architect thought we might have better luck as the owners than he did as a local professional, since we wouldn’t be held to as high a standard.  We therefore staged an early morning kamikaze assault on the inspector, played as dumb and innocent as possible, and walked out with a few recommendations and his verbal approval.  We got the architect to put the finishing touches on the drawings (as suggested by the inspector), bundled them up, turned in the application, and crossed our fingers.  In what can only be described as a minor miracle, we got the approved permit back within 2 days.  A permit to paint the roof took weeks, yet major construction got approved in 2 days.  Go figure…

Don’t Cry for Us, Argentina

Of course, not all the delays brought about while trying to get the foundation permit were bad.  We continued to forge ahead on getting the pool house / guest cottage / etc. to a more habitable state.  In fact, in a previous episode I alluded to our adventures with the French doors.  With your indulgence, patient reader, I shall elaborate.

In order to make the 200 square foot pool house / guest cottage / etc. more inviting while we spend the next 6, 9,12 (?) months living in it, we had decided to install a pair of French doors and a couple of new windows.  After extensive research (wind ratings, value, etc.), we ordered the doors and windows in mid August.  The week before Kevin was prepared to go to NYC for his fundraising ride in September, we got word that the doors would be arriving on the day he was scheduled to depart.  Perfect, we thought; he could help me get them in place, then I could do the finish work while he did the ride.  I immediately set about stripping the old, nasty siding off the exterior of the cottage to prep for the doors, and to frame out the rough openings.

Supporting the roof and leveling the header with bottle jacks

Finished rough framing with insulation replaced

The doors showed up exactly as planned, and we installed them before Kevin left for his ride…  Really?  You’ve been following this blog for how long, and you’d actually believe that?  Do not get lulled into a false sense of hope by an aberrant stroke of good fortune like we had with the foundation permit!

Getting back to reality, of course the doors didn’t show up before Kevin left, and I was stuck with huge, gaping holes in the side of the building.  Despair not, however – growing up in an Italian family, I was raised to believe that everything should be covered in plastic; I simply drew from my heritage and threw plastic sheeting over the side of the cottage (note that it’s been retracted over the roof for the previous photo op). 

Italianate architectural detail in Key West

Fortunately, the French doors did arrive within a few days of their promised delivery date.  Unfortunately, they were backwards.  A bit of explanation is perhaps necessary here.  Ordering these doors is as convoluted a process as anyone might expect when the word “French” is attached to it.  We wanted both doors to open outward, with the left-hand door being the stationary one, and the right-hand door being the active one.  In a counterintuitive masterstroke, that configuration is called “left out-swing,” which of course sounds like the left door is the active one.  What it means, however, is that the left SIDE of the active door swings out.  Sacre bleu!  And we wonder why the French are such mean, bitter people…  Anyway, because it is so confusing, we had actually brought the vendor to the house before we placed the order, and had him sketch the configuration we wanted to be sure there could be no mistake.  Apparently he used that piece of paper to write his lunch order, because it obviously wasn’t what he used to order the doors.

When I called him to explain the problem, he at first tried to intimate that perhaps we had ordered the wrong thing.  Oh no - not only did we do the sketch with him, but I had the e-mail order with the correct, counterintuitive nomenclature in it (I took French in high school, which seems to have helped me in the decoding process).  At that point he turned into Monty Hall and offered to make us a deal on the backwards doors.  I smiled inwardly.  Perhaps you may recall, astute reader, how the other half of this renovation team doesn’t even allow this author to post to the blogsite because he needs to make sure the formatting is in order; needless to say, I knew there wasn’t a chance he’d accept doors that were formatted backwards.  To the vendor’s credit, he sucked up the mistake, and vowed to put a rush on getting new doors to us.  Of course, these had taken more than 3 weeks to screw up, so I couldn’t imagine what a rush order would be like.  It only took me a week to find out.

The vendor called on a Friday to tell me the new doors had arrived, and that we had indeed gotten the correct orientation this time – Hurray!  The only problem was that since it had been a rush order, they didn’t have the inserts yet – Damn… 

How bad could that be, I thought; so I played along: “What are the inserts,” I asked? 

“The glass,” he replied.

Really?  Exterior French doors had shipped without glass in them.  That’s like delivering a computer without a monitor… a car without wheels… a boat without a hull…  However, it was Friday afternoon, I was desperate, and since I had no idea when I might hear from this guy again (he actually has a private plane – no kidding), I went and picked them up anyway.  I decided that I could at least get the doors installed, and he would just have to come to the house to install the glass.  Besides, he promised to put a rush on it…

Birthday Month

Despite the concerted efforts of our vendors, engineers, building inspectors, and historic preservationists, the cerebral hemorrhage they so valiantly attempted to induce never materialized, and I did actually attain the half-century mark in October.  Late September and early October also happen to be birthday times for other significant members of the family, so we took a break from renovating for a week to head north for a communal celebration.  Before we could leave, however, we really needed to button up the exposed cottage.  Towards that end, we did install the insert-free French doors.  As it turned out, the lack of glass made them vastly lighter and easier to handle, so that part of the installation actually went swimmingly (except, perhaps, for the brief moment when I got a little too confident with the door frame and dropped it.  Oh, and did I mention – it broke.  The frame is extruded vinyl, so it snapped like a twig when it hit the uneven deck.  However, after I epoxied it back together, THEN everything went swimmingly.  Let’s just keep this little detail between us, shall we?)  After the doors and windows went in (sorry, the windows were actually delivered and installed without drama or angst, so there really isn’t much of a story there), it was time to install the siding.

The cottage is 16’-2” wide on the front.  I didn’t want to have a bunch of splices in the siding, so the only way to accomplish that feat was to get the lumber in 16’ lengths (there is trim moulding on the edges, clever observer; that’s how we make up the extra 2”).  Unfortunately, our little cargo trailer is only 10’ long, and since we are watching every penny of the budget (remember the dream of frolicking in the pool at the end of all this), I didn’t want to pay for a delivery truck to drop off 18 pieces of lumber.  My solution, much to the chagrin of my partner, was simple:

A true Beverly Hillbillies moment; next time Granny goes on top the trailer, too

Having thus scored the siding, we also needed to procure the aforementioned trim moulding, which turned out to be more daunting than the siding.  (The technically declined may chose to skip ahead at this point).  In order to have a clean, finished look on the edges and around the windows, the preferred method of lap siding installation down here is to install all the trim first, then fit the siding to it.  The most common pressure-treated trim (important because of the elements and the pesky termites) is 1” x 4”.  Unfortunately, 1” x 4” isn’t thick enough to cover the ends of the siding as it laps onto itself; 5/4” x 4” is therefore the lumber of choice for this application.  Of course, with all the old houses, and all the old preservationists requiring that replacement pieces match the original as closely as possible, one would expect to find this 5/4” x 4” in abundance.  Au contraire, mon frère – it is as nonexistent as our friend the Dade County Pine.  The only 5/4” to be found in Key West is 5/4” x 6”, with chamfered edges for decking (that means the edges are rounded, for the technically declined of you who were brave enough to follow along again despite my warnings).  My solution was to re-purpose our erstwhile backyard into a sawmill, and rip down the deck boards to the appropriate size for trim.

Ripping trim moulding in front of the well-ventilated French doors (note the ubiquitous plastic sheeting which continues to remain in the background)

Subsequent to my clever solution in our makeshift lumberyard, I stopped at a local construction site and asked where they got their trim.  They told me they can’t get it either, and that they do it the same way as I did.  Oh well, so much for being smarter than the next guy…

Technically Declined, please rejoin our saga here:

Once we got all the trim moulding up, it was time for siding.  In order to get the spacing just right, I built myself a couple little jigs.  We put the first piece on at the bottom, determined how much we wanted each subsequent piece to “lap” over the first (very astute, erudite reader – that is indeed why it is known as lap siding), and away we went!

My two little jigs.  We screw them in place temporarily, slide the siding piece into place, nail it, then move the jigs up to the next level

Even Kevin got into the act for this operation.  He claims his skill with the jigsaw is superior (curse these old eyes of mine!), so he does the cutout work

I was doing so well with the siding that I got a stroke of inspiration to go along with the perspiration.  I realized that if I cut the siding just a wee bit long and squeezed it in between the trim, I wouldn’t need to screw the jigs in; the tight fit would hold the siding in place long enough for me to nail it, and the jigs would merely be used as spacers.  Of course, it turned out that I was too clever by half.  The foreman on the job came by to criticize, er, inspect my work, and noticed that there was an increasingly large gap between the lower pieces of siding and the trim.  Impossible, said I!  I had cut each one deliberately long, so it wasn’t possible there could be any gaps…  unless, perhaps, wedging each piece of subsequent siding as I went up was flexing the door frame of the open French doors, and creating a gap between the siding and the trim.  Uh-oh.  I tried closing the doors, with “tried” being the operational word.  No luck – the doors were now hitting each other.  In another life (and wooden doors), I probably would have just taken the easy way out and planed an 1/8” off them.  However, they’re vinyl (and French), and thus not inclined to cooperate that way.  Instead, I used a tool that, remarkably and ironically enough, I first saw a Frenchman using at the Hilton Theater when he took down the plaster for Spiderman (perhaps the only valuable thing an American has gotten from a Frenchman since Lafayette’s time).  It’s a cute little reciprocating saw that I was able to use to trim the ends of the offending siding – without taking it down – to relieve the pressure on the door frame.

This little gem is a Fein saw, and believe you me, it is FINE!

I was able to surgically remove about an 1/8” from the ends of the siding, and cleaned up the much smaller gap with a little painter’s caulk (“caulk and paint make a carpenter that ain’t!”)  In any case, the operation was a success, the doors were able to close again, and we finished the siding using the jigs as intended…

The finished product, prior to paint (and door inserts…)

And now, dear reader, I feel as though we have served up such a cornucopia of renovative delights (and inventive vocabulary), that your brain, as well as your tummy, must be brimming.  We shall therefore save dessert-tales, including our exploits during Fantasy Fest (otherwise known to some as gay Christmas…) for the next installment.  However, lest we leave you at all unsatiated, it is important to acknowledge that the door guy did finally come through with the inserts, and we installed them the day before we headed north for our birthday holiday.  Thus, yet another great gift was bestowed upon us, and the cottage was able to shed its plastic skin.